Cp
1.00
Cpk
0.67
Cpu
0.67
Cpl
1.33

Below 1.0: not capable

Expected out of spec (normal assumption): 22,782 PPM (two-sided total) (2.28 %) · above USL 22,750 · below LSL 31.67

PPM ↔ % ↔ sigma level

3.40 PPM = 0.0003400 % = 6.00 σ (short-term, with 1.5σ shift)

Convention: the sigma level adds a 1.5σ shift to the one-tailed z of the defect rate (Six Sigma / Motorola convention), so 3.4 PPM = 6σ and 66,807 PPM = 3σ. Untick the box for the plain z value (3.4 PPM = 4.5).

Download this result

The result above is free. For a PDF or Excel copy for your report, enter your work email once.

Formulas

What Cpk value is good enough?

Many automotive customers ask for Cpk or Ppk of at least 1.67 for new processes and special characteristics, and 1.33 for ongoing production. Your customer's requirement (for example in the PPAP or supplier manual) decides. Check that the process is stable on a control chart first: a Cpk from an unstable process does not predict anything.

σ should come from at least 25 subgroups (≈100 values) or at least 30 individual values. With fewer, Cpk/Ppk has a wide confidence interval: treat it as preliminary. PPM estimates assume normality. Check with a normal probability plot, or use a non-normal method for skewed data.

Worked example (NIST/SEMATECH e-Handbook, section 6.1.6): USL 20, LSL 8, mean 16, σ 2 gives Cp = 1.00 and Cpk = 0.67. The defaults above load this example.

Need every template in one download? Get the full pack

Next: AQL sampling calculator · D6 verification of effectiveness · all free quality tools