Training effectiveness check record: free Excel

One row per person and training: how you check that it works at the job, when the check is due, what it showed, and what followed. The file shows checks that are overdue, results still missing and follow-ups still open.

Free, no card. Enter your email to get the Excel file.

Get the free training effectiveness record

We store your email, sign-up time, your updates choice and the page or campaign link you came from. We use them only to record your sign-up and, if you tick the box, to tell you about new 8D tools. We never sell them. To delete them, email 8dgate@agent.mailboxkit.com.

Own structure and wording. Tested in LibreOffice. Advisory only.

Next to the training matrix

The training matrix template shows who is trained for what. This record covers the step after: was the training checked at the job, what did the check show, and was the matrix updated afterwards.

What is in the file

  • Settings: an as-of date (blank means today) and the check window in days after training. The 30 days are our own default; change them.
  • Log: ref, person or role, training, trained on, how it is checked (Observation at the job, Work sample checked, Questions answered, Other), checked on, checked by, result, follow-up action, training matrix updated.
  • Check due fills in: trained on plus the window. Days to check is check due minus the as-of date, until a checked-on date is entered.
  • If the window is blank, rows not checked yet show "Set the check window in Settings" instead of a due date.
  • Result is a list: Works as trained, Needs more training. The file only shows what you enter.
  • Counts under the log: rows logged and rows per status. No score and no ranking.

How the status is worked out

In this order; the first match wins:

StatusWhen
Enter training dateTrained on is blank.
Enter checked-on dateA result is entered but checked on is blank, so the result is not hidden behind a planned or overdue check.
Set the check window in SettingsNot checked yet and the check window in Settings is blank.
Check overdueNot checked yet and the as-of date is after the check due date.
Check plannedNot checked yet.
Enter resultA checked-on date is entered but the result is blank.
Add follow-up actionResult is Needs more training and the follow-up action is blank.
Retrain and check againResult is Needs more training and a follow-up action is entered. The row stops here.
Update the training matrixResult is Works as trained and training matrix updated is not Yes.
DoneNone of the above.

One row is one check. When a row shows "Retrain and check again", log the re-check as a new row; this row keeps its history. The file does not link the two rows for you, so give the new row a note such as the earlier ref. A row marked Retrain and check again stays amber until you change it.

Example (fictional)

Made-up roles and trainings, extract, as of Thursday 22 October 2026, window 30 days:

RefPerson or roleTrainingCheck dueResultStatusDays to check
T-01Operator 1New torque sequence, station 3Wed 7 Oct 2026Check overdue-15
T-02Operator 2Visual check of seal lipWed 4 Nov 2026Check planned13
T-04Operator 3New label layoutFri 2 Oct 2026Needs more trainingAdd follow-up action
T-06Operator 4Packaging specificationFri 9 Oct 2026Works as trainedUpdate the training matrix
T-07Inspector 2First article checkWed 14 Oct 2026Works as trainedDone

Worth a check each month

  • Overdue checks: a training nobody looked at afterwards.
  • Needs more training without a follow-up action (marked in red), and rows showing "Retrain and check again" with no new row for the re-check yet. The file flags the row; the re-check goes on a new row.
  • Works as trained but the matrix not updated: the matrix then shows less than the record.

Your own procedure decides how a training is checked and by whom. The record is an aid, not a verdict on a person.

Related

Advisory template, in English.