Supplier audit schedule: free Excel

One row per planned supplier audit: supplier, site or process, audit type, owner, interval, last audit, next planned date, when it was done, and findings still open. The file shows audits past their planned date and dates that do not fit together.

Free, no card. Enter your email to get the Excel file.

Get the free supplier audit schedule

We store your email to give you what you asked for. If you tick the box, we may also email you about new tools. We never sell your data. Privacy · To delete it, email 8dgate@agent.mailboxkit.com

Own structure and wording. Tested in LibreOffice. Advisory only.

Last audit, next audit, and what is still open

A supplier audit can slip by months when the last and next dates sit in different files, or when findings from the last audit stay open with no due date. This schedule keeps them on one row per audit. The supplier quality audit checklist covers what to look at during the audit; this file covers when.

What is in the file

  • Settings: an as-of date (blank means today) and an interval in months, used only on rows where the interval is blank. The 12 months are our own default, not from a standard; change them.
  • Log: ref, supplier, site or process, audit type (system, process, product, other), owner, interval, last audit on, next planned on, done on, findings open, finding actions due by.
  • Due by interval fills in: last audit on plus the interval. Days past planned runs from next planned on to the as-of date, for audits not done.
  • A separate check column. The status never hides it, and a row can show several notes, joined with a semicolon.
  • Counts under the log: rows logged, rows per status, rows with a check note, rows past due and not done (any status), a line that should read 0 (rows not in any status), and findings open. No score and no ranking of suppliers.

How the status is worked out

In this order; the first match wins:

StatusWhen
Enter refThe row has an entry but no ref. It still counts.
Enter supplierSupplier is blank.
Done, findings openA done-on date is entered and findings open is above 0.
DoneA done-on date is entered.
Set an intervalThe row interval and the Settings interval are both blank.
Enter planned dateNext planned on is blank.
Past planned dateThe as-of date is after next planned on.
Enter ownerOwner is blank.
PlannedNone of the above.

Check column notes, each followed by "worth a check", on any row whatever its status:

  • Planned date passed, not done
  • Past the interval due, not done
  • Planned after the interval due
  • Last audit after next planned
  • Finding actions open past due
  • Findings open with no action due date
  • No owner
  • Interval blank, Settings default used
  • Done before last audit
  • Done date after the as-of date

So a row still missing its ref or supplier shows that fill-in step, and the check column still says when the audit is past its planned date.

After a Done row, add a new row for the next audit.

Example (fictional)

Made-up suppliers, extract, as of Thursday 22 October 2026, Settings interval 12 months:

RefSupplierInterval (months)Next planned onDue by intervalStatusDays past plannedCheck
S-01Alpha Castings12Tue 13 Oct 2026Wed 14 Oct 2026Done, findings openFinding actions open past due: worth a check
S-02Beta Plastics12Wed 30 Sep 2026Thu 17 Sep 2026Past planned date22Planned date passed, not done: worth a check; Past the interval due, not done: worth a check; Planned after the interval due: worth a check
S-03Gamma Springs24Wed 10 Mar 2027Thu 11 Mar 2027Enter owner0No owner: worth a check
S-04Delta SealsWed 18 Nov 2026Thu 21 Jan 2027Planned0Interval blank, Settings default used: worth a check
S-05Epsilon Fasteners12Wed 13 May 2026Thu 10 Jun 2027Past planned date162Planned date passed, not done: worth a check; Last audit after next planned: worth a check

Worth a check each month

  • Past planned date (marked in red), and any row whose check column says not done.
  • Findings open past their action due date, or with no due date at all.
  • Planned dates later than the interval allows, and last audit dates after the next planned date.
  • Audits with no owner.

From supplier results to the schedule

A supplier with a repeat 8D, a rising count in the supplier PPM log or open actions in the supplier corrective action follow-up log may be worth an earlier audit. That is your call; the schedule does not rank or rate suppliers. When a supplier sends an 8D, check the 8D report before you reply.

Your own procedure and your customers decide how often each supplier is audited. The schedule is a planning aid; it does not decide for you.